Print Version
presents
Construction projects are notorious for their low success rates and dissatisfied stakeholders. Project success (factors, criteria and attributes), and to some extent stakeholders being satisfied, have been researched with minimal practical beneficial outcomes to date. The largest research gaps are that a multivariate approach has not yet been considered; followed by a myopic view of the construct of satisfaction which even though other disciplines have considered since the 1930s, researchers in the current field have treated lightly.
The main objectives are to (a) determine whether correlation and causation exist between project attributes, factors and criteria as compared to the project outcomes of Satisfaction and Project Success; (b) model a framework to calculate the probability of achieving Satisfaction and Project Success; and (c) present generalised scenario probability calculations per stakeholder and stage in the project life cycle in this framework for initial validation in selected Trinidad and Tobago projects.

Mr. TARUN DOERGA has been an educator at UTT since January 2007 disseminating Civil Engineering knowledge in areas ranging from Geotechnical Engineering to Construction Materials and Project Management. Mr. Doerga obtained his degrees in Bachelor of Engineering (Civil) in 2004 at the University of Guyana and Master of Science in Construction Engineering and Management in 2010 at the University of the West Indies.